construction scheduling

Buy 8. Get 10. Trial SmartRock™ Wireless Concrete Sensors!

Try out SmartRock™! Experience real-time temperature and strength monitoring for less.

Designed to Move Data Center Projects Faster

SmartRock® Long Range helps protect schedule and quality on data center construction. Get a FREE quote today!

Champions Don't Leave Pours to Chance.

Get a custom SmartRock® concrete monitoring plan! No purchase needed.

Score the Best Deal Ever on SmartRock® Pro!

Self-calibrating strength and temperature data. Go Pro before July 29!

The Biggest Pitches Need the Longest Range

Find out how you can score 10 free SmartRock® Long Range sensors!

Score 3 Months of SmartRock® Web Premium FREE!

Unlock offer with any SmartRock® sensor order. Ends July 29, 2026.

Get Real-Time Data with SmartRock®

See how it works today

Every Return Load Is a Margin Problem.

Water add-backs and rejected trucks aren’t just operational headaches — they’re profit killers. SmartMix gives you in-transit visibility so you can catch drift before it becomes a return.

iCOR®: Wirelessly Measure the Rate of Rebar Corrosion

The iCOR is the most advanced, non-destructive, wireless corrosion measurement device for evaluating corrosion potential, corrosion rate, and in-situ electrical resistivity of reinforced concrete structures. Get a free quote today!

Monitor Concrete Strength From Your Phone

Buy 50+ sensors. Get a free SmartRock® Pro Trial Kit.

Submittals Slowing Down Your Ready-Mix Operations?

With Giatec SmartMix™, build engineer-ready submittals in minutes with a dynamic, flexible QC engine that keeps you fully in control. Book a demo today!

Looking for Accurate Slump Data in Real Time?

Cut waste and maximize efficiency with in-transit monitoring.
We use cookies to provide you with a better experience, analyze site traffic and assist in our marketing efforts. By continuing to use this website, you consent to the use of cookies in accordance with our Privacy Policy Page.