Who Can Benefit from the SmartRock® Plus Solution?

Speeding up Construction Projects with SmartRock® Plus

SmartRock® Plus is designed to speed up construction on projects incorporating critical path concrete. The days saved on a schedule can benefit the developer, the contractors, and the concrete producer.

For property developers, the time of construction costs money in interest paid on construction loans and lost revenue from not having the facility open to rent-paying tenants or for businesses. By speeding up the construction process with SmartRock® Plus, these costs can be reduced to the developer and make the project more profitable.

Similarly, construction costs for contractors can be reduced by incorporating SmartRock® Plus into the project. By speeding up the project, costs of equipment rental, form rental and labor can be reduced.

When a concrete producer wins a project, they know they’ll get paid on the project, but don’t know how long it will take to finish — delays to the schedule can occur due to weather, change orders, or a number of other reasons. SmartRock® Plus has the capability to speed up projects, so it enables the contractor to shave days off the schedule which means the ready mix supplier produces the concrete sooner and gets paid sooner. For concrete producers, SmartRock® Plus helps reduce time and eliminate delays.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Articles

Differentiating Inert and Reactive Pozzolanic Materials using Bulk Resistivity

Research Background  Portland cement is often replaced by supplementary cementitious materials (SCMs) in concrete to increase sustainability (reducing CO2 emissions due to lower cement contents) and durability (mitigation of alkali-silica reaction, reduced sulfate attack, and reduced chloride penetration). Fly ash and natural pozzolans are specified using ASTM C618/AASHTO M295, and an important part of this specification is the strength activity index test (SAI), which dictates that a mortar mixture with 20% SCM replacement should reach at least 75% strength of the control mixture at either 7- or 28-days. The SAI is a potentially flawed test as inert materials are known to be able to pass the test. The early testing age, low SCM replacement…

Roxi press release

Giatec’s Pioneering AI Programs for Sustainable Concrete Testing and Reducing CO2 Emissions

In late 2020, Giatec announced that our artificial intelligence (AI) program RoxiTM has been trained with the funding provided by Sustainable Development Technology Canada (SDTC), which will help in the reduction of cement usage during concrete testing. For those that are unfamiliar with Roxi’s functions, require deeper insights into how and why this funding came about, or are curious about the approach Giatec takes towards AI in the concrete industry, we encourage you to dive right into this blog post. Make sure to check out other linked resources throughout the article…

Concrete strength monitoring with thermocouples

Choosing the Right Concrete Thermocouple for Your Jobsite

What Is a Concrete Thermocouple?  In layman’s terms, a thermocouple is an electric device that measures temperature, essentially making it a type of thermometer. That being said, it is not the kind of thermometer you would use to measure your body temperature when running a fever, or to deduce what the atmospheric weather is today, or as an in-built mechanism within your refrigerators and heaters. So, what exactly sets a concrete thermometer apart?  It takes two metals to form a thermocouple, both of which are wires that are welded, crimped, or twisted together, and It takes two metals to form a thermocouple, both of which are…

We use cookies to provide you with a better experience, analyze site traffic and assist in our marketing efforts. By continuing to use this website, you consent to the use of cookies in accordance with our Privacy Policy Page.